Manual
1. Installation A (visible rail)

1. Always keep the packing case flat with the opening at the top.

2. Hold the wall jambs together while taking out the door. DO NOT HOLD THE DOOR BY THE FOLDS..
3. Put the supporting cushion pad back in place. Keep the door in the packing case.

4. Mark the holes

5. Fix the ceiling track to the timber head of the door, by one screw, and turn the track in the right direction. The rollers on top the partition are fed into the ceiling track before the track is entirely screw fixed.
6. Mark the holes for fastening the spring fixing clips to one end of the opening.
7. Make sure they are in line with one another. (in the middle of the rail)

8. The rear U-section frame of the partition unit is pushed on to the clips, thereby securing the partition back to the timber wall lining. CHECK THE POSITION OF THE INNER MAGNET, BE SURE IT IS LEVEL.

9. For systems comprising a single unit stacking at one end of the opening, the aluminium wall jamb is screw fixed to the timber wall lining on the opposite wall
10. The steel magnetic keep is then screw fixed to the aluminium wall jamb? (2 screws + 2 tubes)
 

2. 2. Installation B: built-in rail

3. 3. Door with cylinder lock

1. Point 1-2-3-4 identical to ref.1
2. The rollers on the top of the partition are being fed into the track before it is fixed. Do not let the door lean on the ground at any time.
3. Point 6-7-8 identical to ref. 1

1. Point 1-2-3-4-5-6-7-8-9 identical to ref.1
2. Fix the hook with one screw, check the fastening and move to point 10
3. Check the fastening again and finally fastens the second screw from the hook.